• Home
  • VRF System Annual Maintenance

VRF System Annual Maintenance Service

At Acservicebd.com you can hire expert AC technician for VRF System Annual Maintenance service in Dhaka and outside of Dhaka City. Our Expert AC technician will give you the best VRF System Annual Maintenance  service with cheapest price. You can compare VRF System Annual Maintenance Pricing from others. In the below VRF System Annual Maintenance Pricing chart, you can see the details.

S.L
Description
Unit
Price(tk)
01
Indoor Unit Fitting Charges (1 Ton to 5 Ton)
01 Pcs
1,500/-
02
Outdoor Base & Rubber Pad Fitting (Outdoor Loading & Unloading for Company)
01 Pcs
2,000/-
03
Y Joint (Refnet) Fitting
01 Pcs
500/-
04
Wire Remote Fitting
01 Pcs
150/-
05
Suction Copper Pipe Installation (Gas welding, Blazing Rod, AC Tiling Gas, Oxygen Gas, Nitrogen Gas, Nitrogen wash, Nitrogen Pressure with lick test)
01 Rft
100/-
06
Discharge Copper Pipe Installation (Gas welding, Blazing Rod, AC Tiling Gas, Oxygen Gas, Nitrogen Gas, Nitrogen wash, Nitrogen Pressure with lick test)
01 Rft
90/-
07
Power Line Collection Indoor Unit
01 Pcs
150/-
08
Power Line Collection Outdoor Unit
01 Pcs
1,000/-
09
Communication Cable
01 Rft
15/-
10
Drain Pipe Installation
01 Rft
15/-
11
Drain Pipe Conceal Installation
01 Rft
150/-
12
Glass Hole Installation
01 Rft
20/-
13
Fuel Tape Installation
01 Rft
15/-
14
Vacuum
01 Unit
3,000/-
15
Commissioning Charge
01 Unit
4,000/-
S.L
Description
Unit
Price(tk)
01
Indoor Unit Fitting Charges (1 Ton to 5 Ton)
01 Pcs
1,800/-
02
Outdoor Base & Rubber Pad Fitting (Outdoor Loading & Unloading for Company)
01 Pcs
2,200/-
03
Y Joint (Refnet) Fitting
01 Pcs
600/-
04
Wire Remote Fitting
01 Pcs
170/-
05
Suction Copper Pipe Installation (Gas welding, Blazing Rod, AC Tiling Gas, Oxygen Gas, Nitrogen Gas, Nitrogen wash, Nitrogen Pressure with lick test)
01 Rft
120/-
06
Discharge Copper Pipe Installation (Gas welding, Blazing Rod, AC Tiling Gas, Oxygen Gas, Nitrogen Gas, Nitrogen wash, Nitrogen Pressure with lick test)
01 Rft
110/-
07
Power Line Collection Indoor Unit
01 Pcs
180/-
08
Power Line Collection Outdoor Unit
01 Pcs
1,200/-
09
Communication Cable
01 Rft
17/-
10
Drain Pipe Installation
01 Rft
17/-
11
Drain Pipe Conceal Installation
01 Rft
170/-
12
Glass Hole Installation
01 Rft
22/-
13
Fuel Tape Installation
01 Rft
17/-
14
Vacuum
01 Unit
3,500/-
15
Commissioning Charge
01 Unit
4,500/-
S.L
Description
Unit
Price(tk)
01
VRF AC Installation (Package)
01 Ton
2,500/-
S.L
Description
Unit
Price(tk)
01
VRF AC Installation (Package)
01 Ton
3,200/-

Noted:

01. Above mentioned rate/quotations will be applicable for only the area of Dhaka city without VAT&TAX.

S.L
Description
Unit
Price(tk)
01
Servicing per Indoor Unit (1 ton to 5 ton)
01 Pcs
1,500/-
02
Servicing per Outdoor Unit
01 Pcs
2,500/-
03
Overhauling Servicing per Indoor Unit (1 ton to 5 ton)
01 Pcs
2,500/-
S.L
Description
Unit
Price(tk)
01
Servicing per Indoor Unit (1 ton to 5 ton)
01 Pcs
2,500/-
02
Servicing per Outdoor Unit
01 Pcs
3,000/-
03
Overhauling Servicing per Indoor Unit (1 ton to 5 ton)
01 Pcs
3,000/-

Noted:

1. If you need an extra copper pipe after 10 feet of copper pipe, then the customer is required to pay an additional 350tk (three hundred and fifty) taka fer running feet copper pipe.

2. This Price is without VAT & TAX.

S.L
Description
Unit
Price(tk)
01
Lick Repair
01 Unit
10,000/-
02
Vacuum & Gas Charge
01 Unit
15,000/-
03
Indoor Unit PCB Board Change
01 Pcs
10,000/-
04
Outdoor Unit PCB Board Change
01 Pcs
15,000/-
05
Indoor Unit & Outdoor Unit Fan Motor Open & Installation
01 Pcs
10,000/-
06
Commissioning Charge Per Project(Maximum 100 ton)
01 Project
15,000/-
07
Minimum Service Charge (Machine Checking)
01 Unit
8,000/-
S.L
Description
Unit
Price(tk)
01
Lick Repair
01 Unit
20,000/-
02
Vacuum & Gas Charge
01 Unit
20,000/-
03
Indoor Unit PCB Board Change
01 Pcs
20,000/-
04
Outdoor Unit PCB Board Change
01 Pcs
25,000/-
05
Indoor Unit & Outdoor Unit Fan Motor Open & Installation
01 Pcs
20,000/-
06
Commissioning Charge Per Project(Maximum 100 ton)
01 Project
25,000/-
07
Minimum Service Charge (Machine Checking)
01 Unit
20,000/-

Noted:

1. If you need an extra copper pipe after 10 feet of copper pipe, then the customer is required to pay an additional 350tk (three hundred and fifty) taka fer running feet copper pipe.

2. This Price is without VAT & TAX.

Why do you need VRF System Annual Maintenance Service?

  • Optimize Performance: Annual maintenance services ensure your VRF (Variable Refrigerant Flow) system runs efficiently, providing effective heating, cooling, and ventilation throughout the year.

     

  • Energy Efficiency: Regular maintenance helps maintain the VRF system’s energy efficiency by minimizing energy use, lowering utility bills, and promoting environmentally responsible practices.

     

  • Increase Equipment Lifespan: Annual maintenance addresses wear and tear, reducing premature system failures and extending the total lifespan of your VRF equipment.

     

  • Early Issue Detection: Scheduled annual maintenance enables the early detection and treatment of potential issues, reducing the chance of unexpected breakdowns and avoiding costly emergency repairs.

     

  • Enhance Indoor Air Quality: Routine maintenance of system components like filters and coils helps enhance indoor air quality by reducing the buildup of dust, allergies, and pollutants.

     

  • Compliance with Warranty Requirements: Following an annual maintenance schedule guarantees that your VRF system remains compatible with manufacturer warranty restrictions, protecting your investment.

     

  • Investing in annual maintenance is a cost-effective strategy since it helps prevent costly repairs and replacements, thus lowering the overall operational expenses associated with the VRF system.

     

  • Consistent Comfort Levels: Well-maintained VRF systems provide dependable temperature management, guaranteeing consistent comfort for occupants and preventing variations in interior conditions.

     

  • Reduce Downtime: Proactive maintenance reduces the chance of unexpected system failures, decreasing downtime and eliminating disruptions to daily operations or discomfort for occupants.

     

  • Adaptability to Changes: Annual maintenance allows for adjustments to the VRF system depending on changes in building occupancy, space utilization, or other factors, maintaining optimal performance under changing conditions.

     

  • Regular maintenance contributes to the safe operation of the VRF system, resolving any potential safety problems and ensuring the residents’ well-being and the property’s integrity.

Note: For More Information Visit Our Other Website Ponnomela.com