• Home
  • VRF AC Spare Parts

VRF AC Spare Parts

Are you in search of reliable VRF AC Spare Parts? Your quest ends here at Acservicebd.com. Explore our extensive range of high-quality spare parts for VRF AC systems. Whether in Dhaka City or beyond, trust our expertise to provide the best solutions. Our commitment extends beyond just offering spare parts – we ensure top-notch service and unbeatable value for all your VRF AC Spare Parts needs. Count on us for excellence and a seamless experience in maintaining your HVAC system.

S.L
Description
Unit
Price(tk)
01
Indoor Unit Fitting Charges (1 Ton to 5 Ton)
01 Pcs
1,500/-
02
Outdoor Base & Rubber Pad Fitting (Outdoor Loading & Unloading for Company)
01 Pcs
2,000/-
03
Y Joint (Refnet) Fitting
01 Pcs
500/-
04
Wire Remote Fitting
01 Pcs
150/-
05
Suction Copper Pipe Installation (Gas welding, Blazing Rod, AC Tiling Gas, Oxygen Gas, Nitrogen Gas, Nitrogen wash, Nitrogen Pressure with lick test)
01 Rft
100/-
06
Discharge Copper Pipe Installation (Gas welding, Blazing Rod, AC Tiling Gas, Oxygen Gas, Nitrogen Gas, Nitrogen wash, Nitrogen Pressure with lick test)
01 Rft
90/-
07
Power Line Collection Indoor Unit
01 Pcs
150/-
08
Power Line Collection Outdoor Unit
01 Pcs
1,000/-
09
Communication Cable
01 Rft
15/-
10
Drain Pipe Installation
01 Rft
15/-
11
Drain Pipe Conceal Installation
01 Rft
150/-
12
Glass Hole Installation
01 Rft
20/-
13
Fuel Tape Installation
01 Rft
15/-
14
Vacuum
01 Unit
3,000/-
15
Commissioning Charge
01 Unit
4,000/-
S.L
Description
Unit
Price(tk)
01
Indoor Unit Fitting Charges (1 Ton to 5 Ton)
01 Pcs
1,800/-
02
Outdoor Base & Rubber Pad Fitting (Outdoor Loading & Unloading for Company)
01 Pcs
2,200/-
03
Y Joint (Refnet) Fitting
01 Pcs
600/-
04
Wire Remote Fitting
01 Pcs
170/-
05
Suction Copper Pipe Installation (Gas welding, Blazing Rod, AC Tiling Gas, Oxygen Gas, Nitrogen Gas, Nitrogen wash, Nitrogen Pressure with lick test)
01 Rft
120/-
06
Discharge Copper Pipe Installation (Gas welding, Blazing Rod, AC Tiling Gas, Oxygen Gas, Nitrogen Gas, Nitrogen wash, Nitrogen Pressure with lick test)
01 Rft
110/-
07
Power Line Collection Indoor Unit
01 Pcs
180/-
08
Power Line Collection Outdoor Unit
01 Pcs
1,200/-
09
Communication Cable
01 Rft
17/-
10
Drain Pipe Installation
01 Rft
17/-
11
Drain Pipe Conceal Installation
01 Rft
170/-
12
Glass Hole Installation
01 Rft
22/-
13
Fuel Tape Installation
01 Rft
17/-
14
Vacuum
01 Unit
3,500/-
15
Commissioning Charge
01 Unit
4,500/-
S.L
Description
Unit
Price(tk)
01
VRF AC Installation (Package)
01 Ton
2,500/-
S.L
Description
Unit
Price(tk)
01
VRF AC Installation (Package)
01 Ton
3,200/-

Noted:

01. Above mentioned rate/quotations will be applicable for only the area of Dhaka city without VAT&TAX.

S.L
Description
Unit
Price(tk)
01
Servicing per Indoor Unit (1 ton to 5 ton)
01 Pcs
1,500/-
02
Servicing per Outdoor Unit
01 Pcs
2,500/-
03
Overhauling Servicing per Indoor Unit (1 ton to 5 ton)
01 Pcs
2,500/-
S.L
Description
Unit
Price(tk)
01
Servicing per Indoor Unit (1 ton to 5 ton)
01 Pcs
2,500/-
02
Servicing per Outdoor Unit
01 Pcs
3,000/-
03
Overhauling Servicing per Indoor Unit (1 ton to 5 ton)
01 Pcs
3,000/-

Noted:

1. If you need an extra copper pipe after 10 feet of copper pipe, then the customer is required to pay an additional 350tk (three hundred and fifty) taka fer running feet copper pipe.

2. This Price is without VAT & TAX.

S.L
Description
Unit
Price(tk)
01
Lick Repair
01 Unit
10,000/-
02
Vacuum & Gas Charge
01 Unit
15,000/-
03
Indoor Unit PCB Board Change
01 Pcs
10,000/-
04
Outdoor Unit PCB Board Change
01 Pcs
15,000/-
05
Indoor Unit & Outdoor Unit Fan Motor Open & Installation
01 Pcs
10,000/-
06
Commissioning Charge Per Project(Maximum 100 ton)
01 Project
15,000/-
07
Minimum Service Charge (Machine Checking)
01 Unit
8,000/-
S.L
Description
Unit
Price(tk)
01
Lick Repair
01 Unit
20,000/-
02
Vacuum & Gas Charge
01 Unit
20,000/-
03
Indoor Unit PCB Board Change
01 Pcs
20,000/-
04
Outdoor Unit PCB Board Change
01 Pcs
25,000/-
05
Indoor Unit & Outdoor Unit Fan Motor Open & Installation
01 Pcs
20,000/-
06
Commissioning Charge Per Project(Maximum 100 ton)
01 Project
25,000/-
07
Minimum Service Charge (Machine Checking)
01 Unit
20,000/-

Noted:

1. If you need an extra copper pipe after 10 feet of copper pipe, then the customer is required to pay an additional 350tk (three hundred and fifty) taka fer running feet copper pipe.

2. This Price is without VAT & TAX.

How to maintain VRF AC Spare Parts?

  • Routine Inspection: Inspect VRF AC spare components regularly to detect wear, damage, or corrosion symptoms.

     

  • Maintenance Plan: Establish a regular maintenance schedule for the complete VRF system to guarantee optimal performance, including replacement parts.

     

  • Cleaning: Spare parts should be kept free of dust, grime, and debris. Filters, coils, and fan blades are examples of such claims.

     

  • Lubrication: Lubricate moving parts, such as fan bearings, if necessary, to reduce friction and improve the life of spare parts.

     

  • Tighten Joints: Regularly check and tighten electrical and mechanical connections to avoid complications caused by loose or corroded parts.

     

  • Replace Worn Parts: To avoid system inefficiencies and potential malfunctions, replace spare parts that show signs of wear, such as belts, bearings, and gaskets.

     

  • Examine the refrigerant levels: Keep refrigerant levels within the prescribed range to keep the system’s cooling capacity.

     

  • Calibration of Monitoring Sensors: Sensors should be calibrated regularly to ensure accurate readings and avoid false alarms or erroneous system responses.

     

  • Keep Track of Everything: Record all spare component replacements, repairs, and maintenance actions for future reference and analysis.

     

  • Follow the Manufacturer’s Instructions: Maintain particular spare parts by the manufacturer’s rules and recommendations to ensure warranty compliance.

     

  • Inspection by a professional: Schedule professional checks by experienced personnel regularly to assess the general condition of VRF AC spare parts and address any possible difficulties.

     

Note: For More Information Visit Our Other Website Ponnomela.com

scroll arrow